6 Part 6: V-Modell Reference Activities
6.3 Activities
6.3.8 System Elements
6.3.8.1 Integrating into System
|
Work Product: |
Purpose
The basis of the integration of the system or of a »Enabling System will be the »Segments, »Hardware Units, »Software Unit or products of the type »External Unit provided within the framework of the integration. In accordance with the decomposition structure of the architecture, these system elements will be integrated into the system or »Enabling System with the corresponding Implementation, Integration and Evaluation Concept describing the integration plan and the integration approach.
The integration schedule will be established in the subactivity System Element Integration and Evaluation Plan in the project plan.
In accordance with the specifications in the »QA Manual and in the Implementation, Integration and Evaluation Concept, a test, in which the requirements will be verified, shall be performed for the finished system or enabling system.
In case of a successful completion of the tests, the system may be made installable in the operational environment and prepared for »Delivery to the acquirer. enabling systems will be included in the scope of delivery in accordance with the delivery criteria.