1 Part 1: Fundamentals of the V-Modell
1.2 Objectives and Structure of the V-Modell
1.2.4 Limits of the V-Modell
The following aspects are not covered by the »V-Modell. In a »V-Modell Project, these aspects must be regulated in addition, or the »V-Modell must be adapted accordingly:
- The placing of contracts for services is not regulated. The »V-Modell only considers the placing of contracts for subsections.
- During the »Introduction and Maintenance of an Organization-Specific Process Model, the model does not differentiate between acquirer and supplier.
- The organization and execution of operation, maintenance, repair and »Disposal of the system are not covered by the V-Modell. However, planning and preparation of a concept for these tasks are regulated in the V-Modell.